Duplicate a Baseline

    Refer to the following steps to create a baseline by copying from an existing baseline:

    *Note: Only the latest published version of a baseline will be copied to the new baseline.

    1. On the Baselines page, select a baseline with the Retrieved with exception, Unused, or Active status, and click Duplicate.

    2. A suffix _copy is automatically added to the baseline name, and you can update the baseline name.

    3. Ener an option description.

    4. Click Save draft. A new baseline will be created with a draft version.