Configure Job Schedule

    To configure job schedule, navigate to Information Lifecycle > Scope and click Configure job schedule. In the Configure job schedule window, you can configure the following schedules:

    • Schedule for classification – Set a schedule to synchronize the classification trees for information management in the Information management module to the destination.

    • Schedule for content synchronization – Set a schedule to synchronize content from Google Drive to the Information management module for search and management.

    • Prune archived data – Set a schedule to prune the archived data in storage locations based on the configured retention rules.

    To configure job schedules, complete the following steps:

    1. Choose whether to run a job based on a configured schedule.

      • No schedule – If you have configured a job schedule, selecting this option will cancel the job schedule.

      • Configure a schedule – Select this option to configure a customized schedule to run jobs.

        Complete the following steps to configure a schedule:

        • Start time – Select the start time for the job. Click the Calendar icon to select a date, and then click the Clock icon to set a time,

        • Frequency – Specify a frequency for the job.

        • No end date – The job will be run repeatedly until you manually stop it.

        • End after __ occurrences – The job will stop after the defined occurrences that you entered in this field.

        • End by – The job will stop at the exact date and time that you selected.

    2. Click Save to save the configured settings.